LTN
Appendix V—Standard Racked Assembly
wc_tx001216gb.fm
97
13.13 Routing the Coil Cord
Procedure
Follow the procedure below to route the coil cord.
1. At the base of the tower, wrap the coil cord around the tower twice, creating
loops of about 25 cm (10 in.) in diameter.
2. Loosen the connector
(CN)
. Pass the end of the coil cord through the connector
so that approximately 1 m (3 ft) of wires extend inside the Light Tower cabinet,
and re-tighten the connector
(CN)
.
3. Insert the red, black, brown, and orange wires from the coil cord into one of the
supplied looms. Pass this loom through the ballast bracket on the right side of
the machine
(R)
.
4. Insert the yellow, blue, white, purple, and green wires from the coil cord into the
second loom. Pass this loom through the ballast bracket on the left side of the
machine
(L)
.
wc_gr006536
CN
R
L
Содержание LTN 6L
Страница 1: ...0171883en 007 1110 0 1 7 1 8 8 3 E N Operator s Manual Light Tower LTN 6L 60 Hz ...
Страница 17: ...LTN 6L Labels wc_si000381gb fm 17 wc_gr007037 R S U V L H F B N J M D Y FF AA AA DD BB GG EE CC BB HH JJ ...
Страница 37: ...LTN 6L Operation wc_tx000766gb fm 37 o ...
Страница 69: ...LTN Appendix I Assembly Instructions wc_tx001218gb fm 69 Illustrations D wc_gr006517 ...
Страница 117: ......