![Wacker Neuson DT10 Скачать руководство пользователя страница 60](http://html2.mh-extra.com/html/wacker-neuson/dt10/dt10_operators-manual_3065757060.webp)
3-30
BA DT10 en - Edition 1.5 * * dt10b340.fm
Operation
Hydraulic PTO shaft (HPTO) (Opt.)
The hydraulic PTO shaft has an operating pressure of 155 bar and an output of 28 l/min.
☞
Stop the engine
☞
Check whether the control lever for releasing the PTO shaft
14
is in the neutral position
➥
The PTO shaft is switched off
☞
Insert the quick couplers of the accessories into the corresponding connections
P
and
P1
of the PTO shaft of the machine.
☞
Connect PTO shaft; in the process, bring the control lever
14
into position
A
or
B,
depending on what line is to be pressurized.
☞
Regulate the throttle of the dumper until reaching the output required for correct opera-
tion of the work equipment
Caution!
Release the hydraulic PTO shaft only with the quickcouplers used for the work
equipment. Switching on the PTO shaft with no work equipment connected
can be the cause of starting failure or output loss of the dumper, or of oil
overheating in the hydraulic system
.
P1
P
Fig. 58: Hydraulic PTO shaft (HPTO)
14
A
B
Position
Function
• A
1
pushed to the right
Additional upper connection P
• B
1
pushed to the left
Additional lower connection P1
Содержание DT10
Страница 1: ...Operator s manual Track dumper Vehicle model DT10 Edition 1 5 Language en Article number 1000312270...
Страница 5: ...BA DT10 en Edition 1 5 BaDT10en1_5IVZ fm I 3 Table of Contents...
Страница 8: ...I 6 BA DT10 en Edition 1 5 BaDT10en1_5SIX fm Index...
Страница 16: ...1 8 BA DT10 en Edition 1 5 dt10b110 fm Introduction 1 7 Signs and symbols XX XX...
Страница 20: ...1 12 BA DT10 en Edition 1 5 dt10b110 fm Introduction...
Страница 38: ...3 8 BA DT10 en Edition 1 5 dt10b320 fm Operation...
Страница 89: ...BA DT10 en Edition 1 5 dt10b520 fm 5 27 Maintenance...
Страница 98: ...5 36 BA DT10 en Edition 1 5 dt10b530 fm Maintenance...
Страница 106: ...5 44 BA DT10 en Edition 1 5 dt10b560 fm...