![Wacker Neuson DPU 6055 Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/wacker-neuson/dpu-6055/dpu-6055_operators-manual_3280837032.webp)
T00797GB
30
MAINTENANCE
Fuel system
☛
ATTENTION! Do not work close to an open fire and do not smoke when working on the fuel system.
Water separator inspection:
-
Turn hex screw „v“ 2 - 3 turns to detach.
-
Collect the emerging drops in a transparent container.
First water and then fuel drops will emerge, as water is
specifically heavier than diesel fuel. A clear separating line
will make this easily recognizable.
-
Turn the hex screw „v“ back in once only clear fuel emerges.
Fuel filter replacement:
-
Place an appropriate container under the filter to catch
any emerging fuel.
-
Close fuel supply line.
-
Pull fuel line „w“ off from both sides of the fuel
filter „x“ and then put in a new filter.
Important:
Pay attention to cleanliness and avoid letting any
dirt into the fuel line.
-
Always replace fuel filter. Pay attention to the flow
direction - look for the arrows.
-
Allow fuel to flow.
-
After a short test run make sure that fuel filter and line
do not leak.
Screwed connections control:
Make sure all accessible screwed connections are correctly
tightened and in good shape.
☛
ATTENTION!
Do not retighten cylinder head screws!
The adjusting screws for the speed governor
and at the injection system have been provided
with a safety lacquer; do not retighten nor
reset them.
x
w
v
Содержание DPU 6055
Страница 2: ......
Страница 4: ...2...
Страница 7: ...0127308GBIVZ GB fm 5 TABLE OF CONTENTS EC CONFORMITY CERTIFICATE 37...
Страница 17: ...T00796GB 15...
Страница 19: ...T00796GB 17...
Страница 21: ...T00796GB 19...
Страница 24: ...T00796GB 22...
Страница 29: ...T00797GB 27...
Страница 31: ...T00797GB 29...
Страница 37: ...35...
Страница 38: ...36...
Страница 40: ...38...
Страница 41: ...File certificate carefully DIN EN ISO 9001 Certificate...
Страница 42: ......
Страница 43: ......
Страница 44: ......