![Wacker Neuson DPU 6055 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/wacker-neuson/dpu-6055/dpu-6055_operators-manual_3280837027.webp)
T00797GB
25
MAINTENANCE
Maintenance schedule
Component
Maintenance work
Maintenance interval
External hardware
Check for tightness.
approx. 8 hours after
initial start-up
Drive engine
First oil change and filter.
25 hours after initial
start-up
Machine cpl.
Run a visual check to see that everything is
daily
complete and undamaged.
Air filter
Check area around combustion air intake and also
air filter service indicator.
Drive engine
Check oil level, if nec. top up oil.
Centre pole height
Regrease.
weekly
setting, transport lock
Fuel tank
Check water separator.
V-belt
Check V-belt, if. nec. replace.
monthly
Protective frame,
Check attachment screws for tight fit.
central lifting point
Tow-bar head
Check oil level, top up if necessary.
Exciter
Oil change.
every 250 h,
or latest every
6 months
Drive engine
Oil change, change oil filter.
every 250 h
Keep cooling fins free of dirt, clean dry.
Check accessible hardware.
Battery
Check acid level, if nec. top up with distilled water.
Valve clearance
Cold engine: Check valve clearance, and adjust
if necessary.
Inlet valve 0,1 mm - outlet valve 0,2 mm.
Fuel filter
Change filter.
every 500 h
Air filter
Replace filter insert.
Fuel injector
Clean, adjust if necessary, repair or replace.
every 1500 h
Injector valve
Clean, adjust or replace if necessary.
every 3000 h
Содержание DPU 6055
Страница 2: ......
Страница 4: ...2...
Страница 7: ...0127308GBIVZ GB fm 5 TABLE OF CONTENTS EC CONFORMITY CERTIFICATE 37...
Страница 17: ...T00796GB 15...
Страница 19: ...T00796GB 17...
Страница 21: ...T00796GB 19...
Страница 24: ...T00796GB 22...
Страница 29: ...T00797GB 27...
Страница 31: ...T00797GB 29...
Страница 37: ...35...
Страница 38: ...36...
Страница 40: ...38...
Страница 41: ...File certificate carefully DIN EN ISO 9001 Certificate...
Страница 42: ......
Страница 43: ......
Страница 44: ......