T00796GB
16
OPERATION
Electric start
1. Turn the throttle control lever (8) clockwise into load position 1/2 - 3/4.
2. Leave decompression lever (2) in the position „e“.
3. Put the ignition key into ignition switch (25) and turn it clockwise into operating position (the charge control
lamp (27) lights up and the buzzer will be heard). Press in and hold the starter (26) until the engine has
started.
☛
ATTENTION! Wait until the engine stops before repeating the starting procedure.
4. The charge control lamp (27) must turn off immediately after the engine has started running and the
acoustic alarm has stopped. Stop the engine immediately in case of eventual irregularities, then locate the
fault and repair it.
☛
ATTENTION! The machine will start vibrating as soon as the engine starts revving up.
Note: Do not activate automatic decompression lever while the engine is running.
5. Bring the engine up to maximum rpm’s and then check the air filter’s service indicator (also see chapter on
„Maintenance“); clean the dry-type air filter if necessary.
f
e
Содержание DPU 6055
Страница 2: ......
Страница 4: ...2...
Страница 7: ...0127308GBIVZ GB fm 5 TABLE OF CONTENTS EC CONFORMITY CERTIFICATE 37...
Страница 17: ...T00796GB 15...
Страница 19: ...T00796GB 17...
Страница 21: ...T00796GB 19...
Страница 24: ...T00796GB 22...
Страница 29: ...T00797GB 27...
Страница 31: ...T00797GB 29...
Страница 37: ...35...
Страница 38: ...36...
Страница 40: ...38...
Страница 41: ...File certificate carefully DIN EN ISO 9001 Certificate...
Страница 42: ......
Страница 43: ......
Страница 44: ......