Technical Manual
WDGA with EtherNet/IP
6 - Commissioning
© Wachendorff Automation GmbH & Co. KG
56
Figure 6.24: Example configuration
Now go online with the controller and download the program to the controller. As soon
as the controller is online, you must establish a new connection with the device
(preferably voltage reset). Then check, for example in the web server, whether your
parameters have been saved.
Figure 6.25: Encoder information
If all values have been accepted, the device is now fully commissioned and can be
used.