3
308.708.8185 | [email protected] | Rev. 11/20
RETURN TO INDEX
Factory to Farm™ service includes full factory assembly. Dealer is responsible for field readiness.
TO THE DEALER
PRE-DELIVERY CHECKLIST
All working parts move freely, bolts are tight, and cotter pins are spread.
Check for oil leaks and proper hydraulic operation.
Hydraulic hoses correctly routed to prevent damage.
Inflate tires to specified air pressure and torque wheel lug bolts and lug nuts as specified in the manual.
All safety decals correctly located and legible. Replace if damaged.
All reflective decals and SMV sign correctly located and visible when the disc is in trasport position.
Safety/warning lights correctly installed and working properly.
Paint all parts scratched during shipment or assembly.
All safety lockup devices on the Delta Plow are correctly located.
Use the following checklist after your Delta Plow is completely assembled. Check off each item as it is found
satisfactory or after proper adjustment is made.
The Delta Plow has been thoroughly checked and to the best of my knowledge is ready for delivery to the customer.
(Signature Of Set-Up Person/Dealer Name/Date)
NAME
STREET ADDRESS
CITY, STATE/PROVINCE
ZIP/POSTAL CODE
DELIVERY DATE
MODEL NO.
DEALER NAME
DEALER NO.
SERIAL NO.
Содержание Delta Plow
Страница 6: ......
Страница 11: ......
Страница 18: ......
Страница 27: ......
Страница 44: ......
Страница 54: ...RETURN TO INDEX...
Страница 70: ...RETURN TO INDEX 870 5347420 WAMFGCO com PO BOX 5238 Pine Bluff AR 71611...