Installation
Draft
6
Caution
: Pull out the tabs gently out of its groove.
4. Break open the secure shell USB wire seal in the front bezel using a screwdriver as
shown in the following figure.
Figure 2-3: Opening the Secure Shell USB Wire Seal
Note:
A gentle clockwise rotation of the screwdriver will break the wire seal. Do not
apply weight on the seal.
5. Connect the USB devices to the two secure USB device ports.
6. Fix the front bezel and allow the USB cables through the Secure USB shell opening.
7.
Replace the top and the bottom strips and fasten the screws.
Содержание Itona LQ+ Series
Страница 1: ...Itona LQ LQ Series Hardware User Guide ...
Страница 4: ...ii For more details about Product Warranty visit http www vxl net Support Product Warranty Terms aspx ...
Страница 6: ...iv Regulatory Certifications ...
Страница 18: ...Installation Draft 10 Figure 2 11 Under the Counter Left Figure 2 12 Behind the Monitor ...
Страница 36: ...Appendix 28 10 TMDS Clock 20 Hot Plug detect all versions and HEC Data optional HDMI 1 4 with Ethernet ...