ER SERIES ELECTRIC FRYERS - REMOVAL AND REPLACEMENT OF PARTS
F35613 (September 2003)
Page 16 of 48
5.
Reverse procedure to install and check for
proper operation.
NOTE:
When installing, keep all lead wires clear
from moving parts.
BASKET LIFT CAM SWITCH
WARNING:
DISCONNECT THE
ELECTRICAL POWER TO THE
MACHINE AND FOLLOW LOCKOUT
/ TAGOUT PROCEDURES. THERE
MAY BE MULTIPLE CIRCUITS. BE
SURE ALL CIRCUITS ARE
DISCONNECTED.
1.
Remove basket lift covers as outlined under
COVERS AND PANELS.
2.
Disconnect lead wires from cam switch.
3.
Remove screws securing cam switch to motor
mounting plate.
4.
Reverse procedure to install and check for
proper operation.
NOTE:
When installing, place the cam switch block
behind the cam switch for proper spacing.
PUMP AND MOTOR
WARNING:
DISCONNECT THE
ELECTRICAL POWER TO THE
MACHINE AND FOLLOW LOCKOUT
/ TAGOUT PROCEDURES. THERE
MAY BE MULTIPLE CIRCUITS. BE
SURE ALL CIRCUITS ARE
DISCONNECTED.
1.
Open both fryer cabinet doors above the filter
tank drawer.
2.
Pull the filter drawer out and remove splash
guard/cover from tank.
A.
If filter tank is not empty, remove
shortening from filter tank.
3.
Remove the filter tank assembly and push the
tank support arms back underneath the fryer.
NOTE:
The remaining steps are written for front
removal of the pump assembly. If access to the
back of the fryer is available, it may be easier to
remove the pump from the rear.
4.
Disconnect the electrical connection to the
motor.
5.
Separate the swivel hose connections at the
pump.
NOTE:
When viewed from pump end, the right side
is the intake port and the left side is the discharge
port.
6.
Remove motor mounting bolts.
7.
Remove the motor and pump (pipe fittings
attached) from the fryer.
A.
If replacing the pump and motor, remove
the existing pipe assemblies and reuse.
8.
Reverse procedure to install.
NOTE:
Ensure the rubber vibration pad or the
grommets are installed under the motor mounting
plate.
Содержание ERC50
Страница 24: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 24 of 48 COMPONENT LOCATION ...
Страница 25: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 25 of 48 POWER SUPPLY BOX ...
Страница 26: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 26 of 48 CIRCUIT BREAKER SUPPLY BOX ...
Страница 32: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 32 of 48 Heater Circuit ...
Страница 33: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 33 of 48 Basket Lift Circuit ...
Страница 35: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 35 of 48 ...
Страница 37: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 37 of 48 ...
Страница 38: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 38 of 48 Basket Lift ...
Страница 40: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 40 of 48 Frymate Dump Station ...
Страница 45: ...ER SERIES ELECTRIC FRYERS TROUBLESHOOTING F35613 September 2003 Page 45 of 48 NOTES ...
Страница 46: ...ER SERIES ELECTRIC FRYERS TROUBLESHOOTING F35613 September 2003 Page 46 of 48 NOTES ...
Страница 47: ...ER SERIES ELECTRIC FRYERS TROUBLESHOOTING F35613 September 2003 Page 47 of 48 NOTES ...