ER SERIES ELECTRIC FRYERS - REMOVAL AND REPLACEMENT OF PARTS
F35613 (September 2003)
Page 14 of 48
REAR VIEW SHOWN, ELEMENTS LOWERED
FRONT VIEW SHOWN, ELEMENTS RAISED
4.
Remove lift assist springs from the eye bolt
hooks.
5.
Remove lift assist springs from the hangers.
6.
To install springs:
A.
Attach spring hook to hanger thru rear
door opening.
B.
Attach spring hook to eye bolt and tighten
eye bolt mounting nut.
C.
Remove 2x4 lumber and lower heating
elements.
7.
Adjust spring tension as outlined under LIFT
ASSIST SPRING ADJUSTMENT in SERVICE
PROCEDURES AND ADJUSTMENTS.
TILT SWITCH
WARNING:
DISCONNECT THE
ELECTRICAL POWER TO THE
MACHINE AND FOLLOW LOCKOUT
/ TAGOUT PROCEDURES. THERE
MAY BE MULTIPLE CIRCUITS. BE
SURE ALL CIRCUITS ARE
DISCONNECTED.
1.
Remove element head cover as outlined under
COVERS AND PANELS.
2.
Lower heating elements.
3.
Disconnect lead wires from tilt switch.
4.
Remove tilt switch from element head.
5.
Reverse procedure to install and check for
proper operation.
NOTE:
The tilt switch and magnet are mounted in
fixed locations and are not adjustable.
Содержание ERC50
Страница 24: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 24 of 48 COMPONENT LOCATION ...
Страница 25: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 25 of 48 POWER SUPPLY BOX ...
Страница 26: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 26 of 48 CIRCUIT BREAKER SUPPLY BOX ...
Страница 32: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 32 of 48 Heater Circuit ...
Страница 33: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 33 of 48 Basket Lift Circuit ...
Страница 35: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 35 of 48 ...
Страница 37: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 37 of 48 ...
Страница 38: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 38 of 48 Basket Lift ...
Страница 40: ...ER SERIES ELECTRIC FRYERS ELECTRICAL OPERATION F35613 September 2003 Page 40 of 48 Frymate Dump Station ...
Страница 45: ...ER SERIES ELECTRIC FRYERS TROUBLESHOOTING F35613 September 2003 Page 45 of 48 NOTES ...
Страница 46: ...ER SERIES ELECTRIC FRYERS TROUBLESHOOTING F35613 September 2003 Page 46 of 48 NOTES ...
Страница 47: ...ER SERIES ELECTRIC FRYERS TROUBLESHOOTING F35613 September 2003 Page 47 of 48 NOTES ...