Connection Plan 12 V with Temperature Sensor and Motor Battery: 

 

 

 

 

Lengths of 

Charging Cables 

Main Battery I 

Pb 1210  

Pb 1215  

Pb 1220  

Pb 1225    

Pb 1230    

2 x   0.7 -1.1m 

2.5 mm

2

 

4 mm

2

 

4 mm

2

 

4 mm

2

 

4 mm

2

 

2 x   1.1 -1.8m 

4 mm

2

 

6 mm

2

 

6 mm

2

 

6 mm

2

 

 

6 mm

2

 

 

2 x   1.8 -3.0m 

6 mm

2

 

10 mm

2   

**

 

10 mm

2

 

10 mm

2

 

 

10 mm

2

 

 

 

** reduce wire cross section at the terminal if necessary

 

 

CAUTION, Safety Instructions: Mains connection is only allowed to a shock-proof socket, which has 
been installed according to the valid technical regulations, protected with max. 16 A (if required 
mobile/stationary with a fault current breaker (FI) with a nominal residual current of 30 mA). 

 

 

Содержание Pb 1210 SMT 2B

Страница 1: ...charging current 12 V 24 V 2 A for support charging and conservation of charge of the vehicle s starter battery with overcharge protection Further Characteristics of the Unit The charging voltage is f...

Страница 2: ...condition 6 Installation in a well ventilated room protected from rain humidity dust aggressive battery gas as well as in an environment being free from condensation water Never use the unit at locati...

Страница 3: ...nsor Temperature Sensor Order No 2001 is required The temperature sensor controls battery temperature I and the temperature dependent correction of the charging voltage It is connected to the unit ter...

Страница 4: ...for connection is included in the delivery scope Connection Just insert the plug of the remote control into the tip jack Remote Control of the charger Functioning The remote control is equipped with t...

Страница 5: ...6 mm2 6 mm2 2 x 1 8 3 0 m 6 mm2 10 mm2 10 mm2 10 mm2 10 mm2 reduce wire cross section at the terminal if necessary CAUTION Safety Instructions Mains connection is only allowed to a shock proof socket...

Страница 6: ...2 6 mm2 6 mm2 6 mm2 6 mm2 2 x 1 8 3 0m 6 mm2 10 mm2 10 mm2 10 mm2 10 mm2 reduce wire cross section at the terminal if necessary CAUTION Safety Instructions Mains connection is only allowed to a shock...

Страница 7: ...V 25 C 2 h U3 Full Conservation Storage Charging 13 40 V 26 8 V 25 C Continuous AGM Charging Program for Lead AGM Fleece Batteries Adapted to closed gas tight AGM absorbet glass mat batteries and bat...

Страница 8: ...ing process will be interrupted The connected batteries will not be discharged by the charger Thus the charging process can be interrupted at any time In case of frequent interruptions particularly be...

Страница 9: ...the charging current an unnecessary long U1 phase is avoided which might be caused by consumer load falsifying the charging current The LED Main Charging will stop lighting 4 U2 Phase LED Battery Ful...

Страница 10: ...pensation In case of 24 V operation Multiply all indicated voltage rates by 2 TS Temperature Sensor Charging Program Gel Charging Program AGM Fleece Characteristic Line IU1oU2 Characteristic Line IU1o...

Страница 11: ...rvoltage Disconnection 20 sec 15 5 V 15 5 V 15 5 V 15 5 V 15 5 V Ripple Factor Voltage 50mV rms 50 mV rms 50 mV rms 50 mV rms 50 mV rms Input Battery I Temperature Sensor Yes Yes Yes Yes Yes Charging...

Страница 12: ...corresponds to the following standards or standardized documents EN60335 2 29 EN55014 EN55022 B DIN14685 DIN40839 1 EN61000 3 2 EN61000 3 3 EN61000 4 2 EN61000 4 3 EN61000 4 4 EN61000 4 5 EN61000 4 6...