9
• Discharged air must always be conveyed back into hot air ducts (i.e.
discharge of combustion products of water boilers). The unit must have a
single discharge flue (channel used to eject the air produced b y the unit) or
an external wall-mounted discharge.
• The unit must be installed in a position that does not allo w the roll, on the
delivery side, to be accessed with a finger test similar to one sho wn at the
end of this document, in compliance with the pro visions of current laws. If
this condition cannot be guaranteed, it is necessary to install a protection
grille.
• The unit can be mounted on w alls or on ceiling.
• If a unit using solid, liquid or gas fuel (i.e . water boiler, methane stove, etc.)
with no “balanced flow” is installed in the same room and this unit is
watertight, it is necessary to make sure that sufficient air is re-injected to
guarantee a perfect combustion for the existing unit and a correct operation
of the exhaust unit.
Important
• The unit suffer damages, though not visible, or become dangerous if it falls
or is hit with other objects. If this occurs, it is necessary to have it
immediately inspected by a Vortice Technical Assistance Centre.
Useful information for installers
If the wall surface is made of non aligned tiles , apply a washer or another kind
of spacer between the wall and the flange of the unit to realign the flange .
Never tighten the flange on uneven surfaces to avoid interfering with the
operation of the roll.
Installation
1) Remove the protection grid A) from flange B) after loosening scre ws D)
(Fig. 1).
2) Remove flange B) from the motor suppor t C) after loosening screws H)
(Fig. 1-2).
3) Fit the nozzle M) (Ø 100) or N) (Ø 120) on the motor suppor t C) close to
the delivery hole using the screws provided in the accessories bag (Fig. 3).
4) Install the motor support C) next to the delivery hole using the screw
anchors provided in the accessories bag (Fig. 4).
5) Perform the electric connections (Fig. 5), tighten the electrical cord using
the cable clamps provided and reinstall flange B) and g rille A), making
sure that the screws are correctly tightened.
Maintenance
All units come with a mechanical filter fitted on the intak e port.
This filter must be cleaned following the procedure described here below.
1) Remove the filter support E) from the unit following the instructions
provided in Fig. 7).
2) Disassemble the metal filter F) from the filter suppor t E) (Fig. 8), being
careful not to deform it. Wash it with detergent or in the w ashing machine.
3) Carefully clean the filter suppor t E) and reassemble it in its location.
Содержание VORT MAX S
Страница 2: ...2 Fig 1 Fig 2...
Страница 3: ......
Страница 4: ...3 Fig 3 Fig 4 Fig 5...
Страница 6: ...5 Fig 7 Fig 8...
Страница 11: ...10 FOR G B a Light switch b Ceiling rose c Light fitting Fig 9...
Страница 24: ...23...
Страница 25: ...24...