05TA Service Manual
INDEX
8/13/01
12-2
Heat Exchanger --------------------------------------------------------4-1
Heater, Crankcase -----------------------------------------------------9-4
High Head Pressure (Air-Cooled) -------------------------------- 8-10
High Head Pressure (Water Cooled) ------------------------------8-9
High/Low Pressure Switch -------------------------------------------9-3
History, Tube-Ice®-----------------------------------------------------1-1
Hub, Cutter Drive Gear --------------------------------------------- 9-18
I
Ice Bin Thermostat Location--------------------------------------- 3-13
Ice Capacity ---------------------------------------------------------- 11-4
Ice-Making Section ----------------------------------------------------7-1
Important Safety Notice-----------------------------------------------1-2
Inspection, First Arrival -----------------------------------------------2-1
Installation ---------------------------------------------------------------3-1
Installation Review: A Checklist----------------------------------- 3-14
Introduction--------------------------------------------------------------1-1
J, K
L
Low Compressor Oil Level -------------------------------------------8-7
Low Ice Capacity -------------------------------------------------------8-6
Low Pressure Switch --------------------------------------------------9-3
Lubrication-------------------------------------------------------------- 7-5
Lubrication, Compressor ---------------------------------------------7-5
Lubrication, Cutter Gear Reducer ----------------------------------7-6
M
Machine Ratings (50 Hz., 20 HP) -------------------------------- 11-3
Machine Ratings (60 Hz., 15 HP) -------------------------------- 11-2
Machine Room----------------------------------------------------------2-2
Machine Won’ t Run---------------------------------------------8-2, 8-3
Maintenance-------------------------------------------------------------7-1
Maintenance Program-------------------------------------------------7-6
Make-Up Water --------------------------------------------------------3-1
Manual Harvest Push Button ----------------------------5-3, 5-5, 6-2
Metric Conversion---------------------------------------------------- 11-9
Mechanical Cleaning --------------------------------------------------7-4
N
NEMA --------------------------------------------------------------------2-2
Nomenclature, Piping Schematic-----------------------------------4-2
Non-Condensable Gases ------------------------------------------ 9-11
Normal Operating Vitals -------------------------------------------- 11-6
Note To Manager-------------------------------------------------------7-7
O
Oil Pressure Safety Control------------------------------------------9-8
On/Off Switch ----------------------------------------------5-3, 5-5, 6-2
Operating Tips----------------------------------------------------------5-5
Operation Vitals ------------------------------------------------------ 11-6
Optional Equipment, Power Monitor --------------------------- 10-14
Overload, Cutter--------------------------------------------------------6-2
Overload, Pump --------------------------------------------------------6-2
P
Pin, Stainless Steel ------------------------------------------ 9-17, 9-19
Piping and Drain Connections ------------------------------------- 3-1
Piping Schematic, Nomenclature---------------------------------- 4-2
Piping Schematic, Water-cooled ---------------------------------- 4-3
PLC ---------------------------------------------------------------------10-2
Poor Ice Quality-------------------------------------------------------- 8-8
Power Connection ---------------------------------------------------- 3-5
Power Monitor------------------------------------------------------- 10-14
Preventive Maintenance --------------------------------------------- 7-6
Preventive Maintenance Program --------------------------------- 7-8
Preview------------------------------------------------------------------ 1-1
Principle of Operation ------------------------------------------------ 4-1
Programmable Logic Controller -----------------------------------10-2
Pump Down -----------------------------------------------------------9-10
Pump Overload-------------------------------------------------------- 6-2
Pump, Contactor ------------------------------------------------------ 6-2
Q
R
R-22 (HCFC-22) -------------------------------------------1-2, 2-1, 5-1
R-404a (HFC “ SUVA” HP62)---------------------------1-2, 2-1, 5-1
Receipt of Machine --------------------------------------------------- 2-1
Receiver----------------------------------------------------------------- 4-1
Refrigerant, Charge--------------------------------------------------- 5-1
Refrigerant, Leaks ---------------------------------------------------9-11
Refrigerant, Removal------------------------------------------------9-11
Refrigeration System Review--------------------------------------- 5-1
Rotation Check -------------------------------------------------------- 3-6
S
Safety Notice----------------------------------------------------------- 1-2
Safety Symbols and What They Mean --------------------------- 1-3
Safety Valves----------------------------------------------------------- 2-1
Shipping Papers------------------------------------------------------- 2-1
Solenoid Valve ------------------------------------------------- 9-12,9-13
Space Diagram (Air-Cooled Machine)---------------------------- 3-3
Space Diagram (Water Cooled Machine)------------------------ 3-2
Special Precautions -------------------------------------------------- 1-2
Start Push Button (PB1)----------------------------------5-3, 5-5, 6-2
Start-Up ----------------------------------------------------------------- 5-3
Start-Up Checklist ---------------------------------------------------- 5-2
Storage (prior to installation and start-up) ----------------------- 2-2
Suction Cut-Off Unloader ------------------------------------------9-13
Symptoms, Troubleshooting ---------------------------------------- 8-1
T
Technical Service Bulletin (Water Quality) --------------------9-20
Telephone Number, Vogt-------------------------------------------- 1-1
Temperature-Pressure Chart--------------------------------------11-8
Thawing, Chamber --------------------------------------------------- 4-2
Thawing, Timer (T) ----------------------------------------------6-2, 9-9
Thermostat, Bin Installation----------------------------------------3-13
Thermostat, Wiring --------------------------------------------------3-13
Timer, Thawing ---------------------------------------------------6-2, 9-9
Trap (AC Piping) -----------------------------------------------------3-10
Troubleshooting ------------------------------------------------------- 8-1
Troubleshooting, Power Monitor -------------------------------- 10-18
Содержание TUBE-ICE 05TA
Страница 4: ...Vogt Tube Ice Machines Installation Service Manual and Parts Catalog 12A4171M06 05TA Model ...
Страница 46: ...05TA Service Manual ELECTRICAL CONTROLS 8 13 01 6 4 FIGURE 6 2 Electrical Schematic All Voltages 50 60 Hz ...
Страница 82: ...05TA Service Manual SERVICE OPERATIONS 8 13 01 9 18 FIGURE 9 10 Cutter Drive Parts ...
Страница 83: ...05TA Service Manual SERVICE OPERATIONS 8 13 01 9 19 FIGURE 9 11 Cutter Parts crushed ice option ...
Страница 95: ...05TA Service Manual OPTIONS AND ACCESSORIES 8 13 01 10 11 FIGURE 10 3 Control Panel Parts ...
Страница 97: ...05TA Service Manual OPTIONS AND ACCESSORIES 8 13 01 10 13 FIGURE 10 4 Wiring Schematic ...
Страница 103: ...05TA Service Manual TABLES CHARTS 8 14 01 11 1 11 Tables Charts ...
Страница 111: ...05TA Service Manual INDEX 8 13 01 12 4 ...