P24AL & P34AL Service Manual
INSTALLING YOUR TUBE-ICE MACHINE
12/2016
3-13
cycle is 50%. If the compressor cannot be unloaded, then a hot gas bypass to the suction line must
be installed. See Figures 3-13 through 3-16.
Cooling Tower (optional).
When selecting a cooling tower, careful attention must be given to
operating wet bulb conditions. It is advisable to check with your local cooling tower distributor for
their recommendations based on actual operating conditions in your area. An average wet bulb of
78
F is typical in the U.S., but many localities have designed wet bulbs as low as 72
F or as high as
82
F.
The cooling tower water pump must be capable of delivering the required volume of water through
the condenser. Due to cooling tower location and pressure drop through water lines and regulating
valves, the water pump must be sized for each installation. Table 3-3 shows the total heat rejection
in 1000 BTU’s per hour for the P24AL and P34AL at different suction temperatures. The water
piping for the cooling tower and the installation of the pump must be in accordance with the
manufacturer’s instructions. Caution must be used to prevent the condenser water pump from losing
prime during off cycles.
Proper water treatment for the prevention of mineral and foreign matter accumulation in the
condenser or cooling tower is recommended. A water analysis should be obtained to determine the
proper chemicals to use. The use of a 40-mesh strainer in the condenser water supply line is also
recommended.
P24AL - Cylinder
P34AL - Cylinder
Suction
Temperature
F /
C
1”
Tube
1 1/4”
Tube
1 1/2”
Tube
1”
Tube
1 1/4”
Tube
1 1/2”
Tube
21.4 /-6.0
554
512
353
1135
1051
737
16.6 /-8.5
919
853
596
1850
1724
1234
11.3 /-11.5
1420
1324
941
2809
2637
1930
5.5 /-15.7
2120
1987
1440
4121
3901
2926
-1.0 /-18.3
3157
2981
2209
6027
5767
4440
P24AL - Crushed
P34AL - Crushed
21.4 /-6.0
722
779
685
1446
1540
1374
16.6 /-8.5
1167
1247
1113
2282
2412
2189
11.3 /-11.5
1754
1858
1685
3356
3522
3248
5.5 /-15.7
2542
2674
2462
4769
4982
4664
-1.0 / -18.3
3668
3840
3589
6758
7040
6685
Total Heat Rejection is based on pulldown of 105
F SDT. Values are nominal based on open
drive reciprocating compressor.
Consult factory for condenser sizing if desired.
Table 3-3
Total Heat Rejection (MBH)
The condenser water pump should be sized on GPM required for condenser at 80 ft. total discharge
head for a typical installation. However, due to cooling tower location and pressure drop through
water lines, the water pump should be sized for each installation.
Содержание P-24AL
Страница 1: ...12 2016 P 24AL P 34AL TUBE ICE MACHINE Service Manual 5000 ...
Страница 10: ...P24AL P34AL Service Manual TABLE OF CONTENTS 12 2016 vi ...
Страница 14: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 4 Figure 1 1 P24AL 1 Front Side Control Panel ...
Страница 15: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 5 Figure 1 2 P24AL Right Side ...
Страница 16: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 6 Figure 1 3 P24AL Back Side ...
Страница 17: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 7 Figure 1 4 P24AL Left Side ...
Страница 18: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 8 Figure 1 5 P34AL Front Side Control Panel ...
Страница 19: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 9 Figure 1 6 P34AL Right Side ...
Страница 20: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 10 Figure 1 7 P34AL Back Side ...
Страница 21: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 11 Figure 1 8 P34AL Left Side ...
Страница 22: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 12 ...
Страница 28: ...P24AL P34AL Service Manual INSTALLING YOUR TUBE ICE MACHINE 12 2016 3 4 Figure 3 2 P24AL Foundation Layout ...
Страница 31: ...P24AL P34AL Service Manual INSTALLING YOUR TUBE ICE MACHINE 12 2016 3 7 Figure 3 4 P34AL Foundation Layout ...
Страница 32: ...P24AL P34AL Service Manual INSTALLING YOUR TUBE ICE MACHINE 12 2016 3 8 Figure 3 5 Lifting Procedure for P24AL ...
Страница 33: ...P24AL P34AL Service Manual INSTALLING YOUR TUBE ICE MACHINE 12 2016 3 9 Figure 3 6 Lifting Procedure for P34AL ...
Страница 53: ...P24AL P34AL Service Manual HOW YOUR TUBE ICE MACHINE WORKS 12 2016 4 3 Figure 4 1 Piping Schematic for P24AL ...
Страница 54: ...P24AL P34AL Service Manual HOW YOUR TUBE ICE MACHINE WORKS 12 2016 4 4 Figure 4 2 Piping Schematic for P34AL ...
Страница 62: ...P24AL P34AL Service Manual START UP OPERATION 12 2016 5 8 ...
Страница 84: ...P24A P34A Service Manual TROUBLESHOOTING 12 2016 8 12 ...
Страница 97: ...P24AL P34AL Service Manual SERVICING OPERATIONS 12 2016 9 13 Figure 9 5B P24A Water Tank Assembly ...
Страница 110: ...P24AL P34AL Service Manual SERVICING OPERATIONS 12 2016 9 26 ...
Страница 126: ...P24AL P34AL Service Manual TABLES CHARTS 12 16 16 11 8 ...
Страница 130: ...P24AL P34AL Service Manual INDEX 12 2016 12 4 ...
Страница 131: ...Appendix A ...
Страница 134: ......
Страница 136: ...i ...
Страница 137: ...ii ...
Страница 138: ...1 ...
Страница 139: ...2 ...
Страница 140: ...3 ...
Страница 141: ...4 ...
Страница 142: ...5 ...
Страница 143: ...6 ...
Страница 144: ...7 ...
Страница 145: ...8 ...
Страница 146: ...9 ...
Страница 147: ...10 ...
Страница 148: ...11 ...