8
Pump Start
-
Water pressure should be approximately 10 to 15 [psi] higher than pump discharge pressure.
-
Clean water, free of impurities.
-
Maintain system flow rates within the parameters given in Table 1.
Pump
Start
Before putting a VOGT pump into operation for the first time, the following steps should be taken:
5.1
Water System Control Seal
Water System Control Seal
5.2
Axis Unlocking
In case the shaft becomes blocked during transport, use the shaft wrench to rotate the shaft manually in the direction
indicated on the pump housing.
5.3
Motor Rotation Control
With the motor and pump uncoupled, check that the pump rotates freely in the direction indicated on the pump casing,
otherwise the impeller could unscrew causing serious accidents.
5.4
Pump Start
The bearing carrier is supplied with an initial grease charge from the factory, therefore no additional grease should be
added at start-up.
The following graph establishes a comparison between typical times and temperature characteristics of a new grease
lubricated bearing carrier.
Table 1:
Range of flow rates per installed bearing carrier