Assembly instructions KB 1 RH3 on pile-drivable subgrade
page 4 of 13
Transport
The following points are to be observed when transporting components of the vehicle
barrier systems:
·
A regulation load securing system is to be made available.
·
When transporting on salt-treated roads, the components must be transported
on enclosed / tarpaulin-covered truck trailers.
·
Avoid contact with other aggressive transported materials (e.g. residual
chemicals on the loading space).
·
The lifting gear is to be designed for a maximum package weight of 2.5 t.
Note:
A proper load securing system must also be used when
transporting equipment for installation of vehicle barrier
systems.
Requirements for installation
The executing contractor (=installation firm) must have the professional aptitude and
general qualifications for the undertaking of such installation work.
The installation firm must be in possession of the technical equipment required for
the professional and proper undertaking of the installation work. This includes, in
addition to a fleet of vehicles adapted for this type of work, especially the pile-driving
equipment for the required post segments with adapted drive heads and guides as
well as drilling equipment, impact screwdrivers, mandrels and measuring equipment,
etc.
The installation firm must maintain all relevant national and international laws,
regulations, directives, etc. and ensure that the required permits are available and
have been submitted in good time.
The following must be checked by the installation firm prior to the start of installation
·
Possible existing installations in the area of the anchoring must be assessed
and correspondingly taken into consideration
·
The suitability of the subgrade (soil class, sufficient bore depth, evenness, etc.)
is to be checked.
·
The definitive reference line must be marked for installation of the vehicle barrier
system.
·
The delivery of materials must be checked for correctness and completeness
and complaints must be immediately forwarded to the supplier.
·
It must be ensured that the building site is properly secured.