Assembly instructions KB 1 RH3 on pile-drivable subgrade
page 12 of 13
11. Conformity checks
The following checks are to be undertaken during the installation process and by way
of final inspection:
·
Correct alignment and bolting of the structural components
·
Vertical gap between the barriers and upper edge of the tension bar and
reference level
·
Horizontal gap between the front edge of the protective barrier post and the
respective reference line for the installation
·
Continuous line of the longitudinal elements (protective barrier post, tension
bar)
Suitable corrective measures are to be undertaken in the event of deviations outside
the range of permissible tolerances.
It is to be checked that the system has been installed correctly in accordance with the
installation instructions upon completion of the installation work and this should be
documented in the acceptance certificate.
12. Clearing the construction site
All residual materials (including connecting devices), packaging and supporting
timber, screw boxes, foil, packaging straps, etc. and any other rubbish must be
removed from the site.
The construction site is subsequently to be swept clean.
Repairing the vehicle barrier system
All components which exhibit mechanical damage or deformation subsequent to an
accident are to be replaced by new components. The installation of these
components is to be undertaken in accordance with the installation instructions.
New connecting devices are generally to be used when repairing a vehicle barrier
system.