3
1 PACKAGING ITEMS
P. 4
2 SPECIFICATIONS
P. 5
3 PROJECTION DISTANCE CHART
P. 7
4 INSTALLATION STEPS FOR WALL MOUNTED BRACKET
P. 9
5 ADJUSTING STEPS OF PROJECTOR IMAGE
P. 13
(1)
:
Dismantle parts
(2)
:
Verify the strength of walls, installation environment, installation
position and drill holes on the walls.
(3)
:
Install hanger frame on walls.
(4)
:
Verify the distance of the projector. Move the three axis
fine-tuner to proper position according to the projector distance
chart.
(5)
:
Power cord should pass through the hanger frame.
(6)
:
Adjust the slider plate up and down to align to the
standard position.
(7)
:
Install the projector onto the hanger frame.
(8)
:
Connect the power cord and other electrical cables to the
projector.
(1) Switch on the projector
(2) Adjust the aspect ratio
(3) Display the test image
(4) Adjust the left and right alignment position
(5) Adjust the up and down rotation
(6) Adjust the left and right rotation
(7) Adjust the keystone
(8) Adjust the image size
(9) Adjust the image up and down
(10) Switch off the testing image display