Test operation
118
Installation
11. Test operation
11.1 The test operation must be carried out after the entire installation has been
completed.
11.2 Please confirm the following points before the test operation.
¾
The indoor unit and outdoor unit are installed properly.
¾
Tubing and wiring are correctly completed.
¾
The refrigerant pipe system is leakage-checked.
¾
The
drainage
is
unimpeded.
¾
The ground wiring is connected correctly.
¾
The length of the tubing and the added stow capacity of the refrigerant have been recorded.
¾
The power voltage fits the rated voltage of the air conditioner.
¾
There is no obstacle at the outlet and inlet of the outdoor and indoor units.
¾
The gas-side and liquid-side stop values are both opened.
¾
The air conditioner is pre-heated by turning on the power.
11.3 Test operation
Set the air conditioner under the mode of "COOLING" by remote controller, and check the following points.
Indoor unit
¾
Whether the switch on the remote controller works well.
¾
Whether the buttons on the remote controller works well.
¾
Whether the air flow louver moves normally.
¾
Whether the room temperature is adjusted well.
¾
Whether
the
indicator
lights
normally.
¾
Whether the temporary buttons works well.
¾
Whether
the
drainage
is
normal.
¾
Whether there is vibration or abnormal noise during operation.
Outdoor unit
¾
Whether there is vibration or abnormal noise during operation.
¾
Whether the generated wind, noise, or condensed of by the air conditioner have influenced your
neighborhood.
¾
Whether any of the refrigerant is leaked.
Содержание ACP-12CC35AERI
Страница 2: ......
Страница 4: ......
Страница 16: ...Service Space 12 Indoor Units 3 Service Space 1000mm 1000mm 1000mm 1000m m ...
Страница 19: ...Air Velocity Distributions Reference Data Indoor Units 15 30 42K Cooling Heating ...
Страница 20: ...Air Velocity Distributions Reference Data 16 Indoor Units 48 55Kφ φ Cooling Heating ...
Страница 25: ...Field Wiring Indoor Units 21 10 Field Wiring ...
Страница 33: ...Wiring Diagrams Indoor Units 29 ...
Страница 34: ...Static Pressure 30 Indoor Units 5 Static Pressure ACP 24DT70AERI ACP 36DT105AERI ...
Страница 35: ...Static Pressure Indoor Units 31 ACP 42DT120AERI ACP 48DT140AERI ACP 55DT160AERI ...
Страница 44: ...Service Space 40 Indoor Units 3 Service Space ...
Страница 46: ...Wiring Diagrams 42 Indoor Units Pre setting Instructions ...
Страница 55: ...Field Wiring Indoor Units 51 10 Field Wiring ...
Страница 58: ...Features 54 Indoor Units ...
Страница 60: ...Service Space 56 Indoor Units 3 Service Space ...
Страница 61: ...Wiring Diagrams Indoor Units 57 4 Wiring Diagrams ACP 12CC35AERI ACP 18CC50AERI ...
Страница 65: ...Field Wiring Indoor Units 61 10 Field Wiring ACP 12CC35AERI ACP 18CC50AERI ...
Страница 69: ...Console Type Console Type 65 2 Dimensions 1 6 D r a i n p i p e 195 Hanging arm Unit mm 700 600 210 ...
Страница 70: ...Console Type 66 Console Type 3 Service Space ...
Страница 71: ...Console Type Console Type 67 4 Wiring Diagrams ACP 12CT35AERI ...
Страница 76: ...Console Type 72 Console Type 10 Field Wiring ACP 12CT35AERI ...
Страница 77: ...Console Type Console Type 73 ...
Страница 83: ...Wiring Diagrams Outdoor Units 79 4 Wiring Diagrams ACP 12 CC CT 35AERI ACP 18 CC CF 50AERI ...
Страница 84: ...Wiring Diagrams 80 Outdoor Units ACP 24 CC CF DT 70AERI ...
Страница 85: ...Wiring Diagrams Outdoor Units 81 ACP 36 CC CF DT 105AERI ...
Страница 86: ...Wiring Diagrams 82 Outdoor Units ACP 42 CC DT 120AERI ...
Страница 87: ...Wiring Diagrams Outdoor Units 83 ACP 48 CC CF DT 140AERI ACP 55 CC CF DT 160AERI ...
Страница 113: ...Refrigerant pipe installation Installation 109 ...
Страница 176: ......
Страница 177: ...ZZZ 9 9 FRP ...