Installation Guide
12
Cable Installation
1. Back the set-screws off fully before attaching the cable. Do not
use the attaching screws to “pull” the cable onto the female D
Sub connector of the board.
2. Orient the D Sub on the cable properly and apply slight even
pressure while connecting the D Subs.
3. Secure the Universal Cable in place with the two screws.
4. Attach the patch cables to the Universal Cable as per the
installation.
NOTE
Apply strain relief as required when attaching patch
cables. The set-screws will easily support the
Universal Cable strain, but will not take into account
the wieght and strain of any connected cables.
Содержание ReelTime 4
Страница 1: ...ReelTime 4 4ReelTime Pro User Manual Visual Circuits Corporation ...
Страница 8: ...iv Contents ...
Страница 13: ...Overview 5 Figure 1 Front view of 4ReelTime Pro board Figure 2 Front view of ReelTime 4 board ...
Страница 16: ...Overview 8 ...
Страница 22: ...Installation Guide 14 ...
Страница 40: ...Multi Card Servers 32 ...
Страница 44: ...Troubleshooting Overview 36 ...
Страница 54: ...Troubleshooting Tips 46 ...
Страница 58: ...Contacting Visual Circuits Corporation 50 ...