INCLINE MOTOR REPLACEMENT
(T7200/8200)
Tools required:
ü
Philips screwdriver
ü
Wrench ( 17mm)
Procedure:
1.
Release screws from the front top cover by using
screwdriver to open the cover.
2.
Fold up and engage the frame to the left support
by using deck-locking knob.
3.
Use screwdriver to loosen the screws from the
motor cover and remove it.
4.
Use screwdriver to loosen the screws from the
elevation assembly cover and remove it.
5.
Disconnect cables connecting to the incline
motor and lower board.
7-11 Revision: 1.0 Date: 2001-06-01
Содержание Vision Series
Страница 1: ......
Страница 4: ...SECTION 1 MAINTENANCE PROCEDURE ...
Страница 10: ...SECTION 2 IMPORTANT SAFETY INSTRUCTIONS ...
Страница 12: ...SECTION 3 WIRING DIAGRAM INSTRUCTION ...
Страница 19: ...SECTION 4 CONSOLE ENGINEERING MODE GUIDE ...
Страница 23: ...SECTION 5 MCB LED INSTRUCTIONS ...
Страница 30: ...SECTION 6 TROUBLESHOOTINGS ...
Страница 42: ...SECTION 7 PARTS REPLACEMENT PROCEDURE ...
Страница 67: ...SECTION 8 SERVICE FORM ...