(JET-7200/8200)
RUNNING BELT/DECK/ROLLER REPLACEMENT
Tools required:
ü
Philips screwdriver
ü
T-handle key (6mm,5mm)
Procedure:
5.
Remove two end plates of the side rail and pull
out the two side rails.
6.
Turn the flywheel counterclockwise by using
your left hand and pull the drive belt out from the
pulley of the front roller by using your right hand.
7.
Loosen the screws from the front and rear
rollers, remove the front roller and rear roller.
(If replacing the roller, go to step 13)
8.
Loosen the 8 screws holding the deck to the
frame then remove the deck with the running belt.
(If replacing the running deck, go to step 11)
9.
Remove the fix plate with screwdriver.
10.
Replace the deck and tighten the fix plate, then
install a new running belt.
(Go to step 14)
7-7 Revision: 1.0 Date: 2001-06-01
Содержание Vision Series
Страница 1: ......
Страница 4: ...SECTION 1 MAINTENANCE PROCEDURE ...
Страница 10: ...SECTION 2 IMPORTANT SAFETY INSTRUCTIONS ...
Страница 12: ...SECTION 3 WIRING DIAGRAM INSTRUCTION ...
Страница 19: ...SECTION 4 CONSOLE ENGINEERING MODE GUIDE ...
Страница 23: ...SECTION 5 MCB LED INSTRUCTIONS ...
Страница 30: ...SECTION 6 TROUBLESHOOTINGS ...
Страница 42: ...SECTION 7 PARTS REPLACEMENT PROCEDURE ...
Страница 67: ...SECTION 8 SERVICE FORM ...