Vision Series 5 Controller User Manual
12
© 2019 Vision Engraving Systems
2
1624R, 2525 and 2550 Series 5 Installation
2.1
Locating the Router
1.
Locate all equipment indoors on a flat surface and on a solid foundation.
2.
Temperature must remain between 40°F and 85°F.
3.
Do not expose machine to direct sunlight, rain, vibration, dampness, or explosive environments.
4.
The machine dimensions are:
1624R - 44" (W) x 34" (L) x 31" (H), shipping weight = 290 lbs.
2525 - 40” (W) x 47” (L) x 64” (H), shipping weight = 534 lbs.
2550 - 40” (W) x 71” (L) x 64” (H), shipping weight = 737 lbs.
2550 Vacuum Pump (supplied with 2550 Vacuum Table machines only) - 28” (W) x 44” (L) x
25” (H), shipping weight = 400 lbs.
NOTE:
If you use our freight company, the equipment will be placed on the ground and a
pallet jack or other device is necessary to move the crate into your facility.
5.
The sides of the crate unscrew, but it will take four people to remove the router from the shipping
crate and place it on the included stand (2525/2550 models only) once the stand is assembled.
6.
A stand kit for the 2525/2550 machines is packed under the machine in the crate and requires
approximately 30 - 45 minutes to assemble. The instructions for assembling the stand are
included in the crate.
7.
A distance of at least 1 Meter (3 feet) is recommended around all sides of the machine to ensure
easy operating, material handling, cleaning, maintenance and safety. The machine's stand is
equipped with wheels, so it can be moved as necessary.
8.
Typically, the router table is oriented as shown in the layout diagrams, at least 36” from any wall.
9.
Cutters and sample materials must be available before the scheduled installation/machine
orientation date.
10.
If a chip extraction unit has not been purchased from Vision, it is highly recommended that one is
available for the installation/machine orientation.
11.
If ordered, the NSK High Frequency Spindle requires a clean air source. The airflow requirement is
1 CFM @ 40 psi.
Содержание 1624R
Страница 1: ...2019 Vision Engraving Systems Vision 1624R 2525 and 2550 Series 5 User Guide Revised 7 3 2019...
Страница 15: ...1624R 2525 and 2550 Series 5 Installation 15 2019 Vision Engraving Systems Vision 2550 installation layout...
Страница 20: ...Vision Series 5 Controller User Manual 20 2019 Vision Engraving Systems 1624R Diagrams...
Страница 21: ...1624R 2525 and 2550 Series 5 Installation 21 2019 Vision Engraving Systems...
Страница 22: ...Vision Series 5 Controller User Manual 22 2019 Vision Engraving Systems...
Страница 26: ...Vision Series 5 Controller User Manual 26 2019 Vision Engraving Systems 2525 2550 Diagrams...
Страница 27: ...1624R 2525 and 2550 Series 5 Installation 27 2019 Vision Engraving Systems...
Страница 29: ...1624R 2525 and 2550 Series 5 Installation 29 2019 Vision Engraving Systems Vacuum Table Top View...
Страница 34: ...Vision Series 5 Controller User Manual 34 2019 Vision Engraving Systems Vision Series 5 controller rear view...
Страница 37: ...1624R 2525 and 2550 Series 5 Installation 37 2019 Vision Engraving Systems...
Страница 39: ...1624R 2525 and 2550 Series 5 Installation 39 2019 Vision Engraving Systems Engraving Head Diagram Installed...
Страница 52: ...Vision Series 5 Controller User Manual 52 2019 Vision Engraving Systems Router Rail Plate Carriage rear view...
Страница 54: ...Vision Series 5 Controller User Manual 54 2019 Vision Engraving Systems...
Страница 58: ...Vision Series 5 Controller User Manual 58 2019 Vision Engraving Systems...
Страница 67: ...Vision Mov UI Software Installation 67 2019 Vision Engraving Systems Select Step 1 Setup Machine...
Страница 81: ...Vision Software Installation 81 2019 Vision Engraving Systems Select Continue on the Font Installation screen...
Страница 128: ...Vision Series 5 Controller User Manual 128 2019 Vision Engraving Systems...
Страница 130: ...Vision Series 5 Controller User Manual 130 2019 Vision Engraving Systems...
Страница 131: ......