background image

Maintenance

12

4.3 Replacing Cartridges

It is recommended to change the filter cartridge every six months (or earlier). Please note that a drop in pressure may 
indicate that the filter cartridge requires replacement.

Note: Prior to performing any work on the drinking water system, ALWAYS DISCONNECT THE CONTROLLER FIRST. As 
a small amount of water may leak from the cartridges during this procedure, please place a small bucket under the system 
to catch any water.

Procedure:

1.

Shut-off the water flow to the unit, depress pressure relief button on top of the filter head to relieve pressure in the filter.
Refer to 

Figure

 

5

.

2.

Place a bucket or pail under the stainless steel chamber. Remove retaining nut to drain system.

3.

Remove the filter housing from the unit by turning the blue collar counter-clockwise until it falls free from the head. Pull
down the white filter housing (be careful as it will be full of water and will be heavy). Refer to 

Figure 6

.

Figure 5 Pressure Relief Button

Figure 6 Removing Filter Housing

1

2

Содержание VH200-F10

Страница 1: ...tario Canada N1L 1R1 t 1 519 763 1032 tf 1 800 265 7246 US and Canada only t 31 73 747 0144 Europe only f 1 519 763 5069 e mail info viqua com www viqua com Models VH200 F10 VH410 F20 Owner s Manual P...

Страница 2: ...y should you insist on genuine factory supplied VIQUA replacement lamps Use of widely available non genuine replacement lamps has been shown to damage the control module of VIQUA UV disinfection equip...

Страница 3: ...started Warning This product may contain chemicals known to the State of California to cause cancer and birth defects or other reproductive harm DANGER Failure to follow these instructions will resul...

Страница 4: ...o clean up a broken lamp as this may scatter the spilled mercury Obey local regulations and guidelines for the removal and disposal of mercury waste NOTICE The UV lamp inside the disinfection system i...

Страница 5: ...tems 5 IEC Replacement Power Cords For VIQUA ICE Controller Sold Separately 260010 NORTH AMERICAN NEMA 5 15P 3 PRONG GROUNDED 602637 CONTINENTAL EUROPEAN CEE 7 7 2 PIN WITH GROUND SCHUKO 260012 UK VER...

Страница 6: ...shows the installation of a typical drinking water system and the related components that may be used for the installation The use of a bypass assembly is recommended in case the system requires off...

Страница 7: ...e system to the wall with appropriate lag bolts not supplied through the two mounting holes located on the metal bracket The use of a flow restrictor device is recommended when installing your system...

Страница 8: ...e in the house for a minute to flush out the warm water 3 2 Disinfection Procedure UV disinfection is a physical process and does not add any potentially harmful chemicals to the water As UV does not...

Страница 9: ...e above disinfection procedure will result in a massive chlorine residual far in excess of the 0 5 to 1 0 mg L typically present in municipally chlorinated water and of a magnitude consistent with the...

Страница 10: ...or UV lamp disposal Do not use water during replacement of UV lamp 1 Shut off the water line to chamber and release system pressure before servicing 2 0 30 15 45 10 mins Disconnect main power source a...

Страница 11: ...quartz sleeve Remove the quartz sleeve 4 Clean the quartz sleeve with a cloth soaked in CLR vinegar or some other mild acid and then rinse with water Note If sleeve cannot be cleaned completely or it...

Страница 12: ...a small bucket under the system to catch any water Procedure 1 Shut off the water flow to the unit depress pressure relief button on top of the filter head to relieve pressure in the filter Refer to...

Страница 13: ...hem P N OR40 50 5 Ensure o rings are liberally coated with a silicone based lubricant 6 Install the new cartridge in the reverse procedure as stated above turning the collar clockwise until the sump i...

Страница 14: ...tting Lamp Life Refer to Section 4 1 Note Even though the alarm on the system can be deferred for a period of time it is important to address each and every alarm condition as they are indicating that...

Страница 15: ...ng seal on retaining nut Ensure O ring is in place check for cuts or abrasions clean O ring moisten with water lubricant and re install replace if necessary Refer to Section 2 for part number Condensa...

Страница 16: ...Manufacturer s Dose Flow Chart 16 Section 7 Manufacturer s Dose Flow Chart Not performance tested or certified by NSF Figure 9 Dose Flow Chart VH200 F10 VH410 F20 VIQUA Standard 32...

Страница 17: ...lbs 13 2 kg 29 lbs Electrical Voltage 100 240 V 50 60 Hz 100 240 V 50 60 Hz Max Current 1 5 Amp 1 5 Amp Power Consumption 35 W 60W Lamp Watts 27 W 45W Maximum Operating Pressure 100 psi 689 kPa 100 p...

Страница 18: ...Hardware Components VIQUA warrants the electrical controller and hardware components to be free from defects in material and workmanship for a period of three 3 years from the date of purchase During...

Страница 19: ...425 Clair Rd W Guelph Ontario Canada N1L 1R1 t 1 519 763 1032 tf 1 800 265 7246 US and Canada only t 31 73 747 0144 Europe only f 1 519 763 5069 e mail info viqua com www viqua com...

Отзывы: