Installation
7
2.
Select a suitable location for the disinfection system and its related components. As it is recommended to install a
ground fault protected circuit (GFCI), make sure that this is taken into consideration prior to any installation. When
selecting a mounting location, enough space must be left to allow for the removal of the UV lamp sleeve, as well as
enough space to change out the filter cartridges. See
Figure 3
for typical clearance dimensions.
Note: The above illustration is relevant for VH200 only.
3.
Mount the system to the wall with appropriate lag bolts (not supplied) through the two mounting holes located on the
metal bracket. The use of a flow restrictor device is recommended when installing your system in order to maintain the
manufacturers maximum rated flow. The flow restrictor should be installed on the outlet port and is designed to be
installed in one direction only. Ensure that the flow of the water matches the flow direction as indicated on the flow
restrictor. Refer to
Figure 4
.
Note: DO NOT solder connections while attached to the system as this could damage the O-ring seals.
Figure 3 Disinfection Installation
Figure 4 Flow Restrictor
Min. 12” From
T
op to Unit
18” Overall Length
Min. 4” From
Bottom to Unit
Drip Loop