
Chapter 3 Deployment IM 253DP
Manual VIPA System 200V
3-56
HB97E - IM - RE_253-xDPxx - Rev. 12/44
To be compatible with the STEP
7 projecting tool from Siemens, you have
to execute the following steps for CPU 214 and DP master:
•
Start the Hardware configurator from Siemens
•
Install the GSD-file vipa_21x.gsd
•
Project a CPU 315-2DP with DP master (master address 2)
•
Add a PROFIBUS slave
"VIPA_CPU21x"
with address 1.
•
Include a CPU
214-1BA03
at slot 0 of the slave system
•
Include the DP master 208-1DP01 (place holder) at slot 1 and include
the output module 222-1BF00 at slot 2.
•
Give the output module 222-1BF00 at slot 0.
To connect your real CPU 214DP, you have to execute the following steps
after including the GSD-file vipa04d5.gsd:
•
Add the PROFIBUS slave
"VIPA_CPU2xxDP"
(address 3)
•
Include the "2 Byte Output" element at slot 0 and choose the output
address 20.
•
Include the "2 Byte Input" element at slot 1 and choose the input
address 10.
•
Save your project.
Engineering
CPU 214 of the
DP master
PROFIBUS link-up
of the CPU 214DP
Содержание IM 253 DP Series
Страница 1: ...VIPA System 200V IM Manual HB97E_IM RE_253 xDPxx Rev 12 44 November 2012...
Страница 4: ...Contents Manual VIPA System 200V ii HB97E IM RE_253 xDPxx Rev 12 44...
Страница 8: ...Safety information Manual VIPA System 200V 4 HB97E IM RE_253 xDPxx Rev 12 44...
Страница 26: ...Chapter 1 Basics and Assembly Manual VIPA System 200V 1 18 HB97E IM RE_253 xDPxx Rev 12 44...
Страница 100: ...Chapter 3 Deployment IM 253DP Manual VIPA System 200V 3 60 HB97E IM RE_253 xDPxx Rev 12 44...