14
ACTO
230 V~
3 - Risk assessment
Before starting to install the automation system it is necessary to evaluate all possible points of danger during the movement of the gate. Fig. 2 highlights
some of the danger points of the sliding gate.
Before starting installation you need to check that the gate slides properly, that there are secure mechanical stops and check the gate support system.
System set-up
4 - Electrical wiring harnesses
C
B
A
A
A - Crushing
B - Conveying
C - Shearing
B
1
2
3 x 0.5 mm
2
2 x 1 mm
2
+ RG58
4 x 0.5 mm
2
2 x 0.5 mm
2
3 x 1.5 mm
2
Key:
1 - Photocells
2 - Selector switch
3 - Flashing light with aerial
4 - Gear motor
5 - Rack
5
4
Fig. 2
Fig. 3
3
1
120-230V~