61
5790 980 - 04
Vitoligno 300-C Installation/Service
Commissioning, Inspection and Maintenance
Checking all Connections on the Heating Water Side for Leaks
Switching on the Power and Starting the Commissioning Sequence
After switching the power on, a commissioning
sequence commences. If it does not start automatically,
press
Ù
/
Ú
simultaneously for approx. 5 sec.
While making the following inputs, these keys may
also be pressed:
ä
to go back one step
å
to display the commissioning menu structure
Setting the Language
Shortly after switching the power on, the display shows
“Select language”.
Press the following keys:
1.
|
/
~
for the required language.
2.
d
to confirm.
Loading the Standard Setting
Press the following keys:
1.
|
/
~
for “Yes” or” No”.
2.
d
to confirm.