Vitoligno 300-C Installation/Service
5790 980 - 04
68
Commissioning, Inspection and Maintenance
Calibrating the O
2
Probe
Note:
Probe calibration must not be performed during
commissioning.
The probe calibration required when replacing the
Lambda probe can only be performed manually.
For calibrating the Lambda probe, see page 104.
Filling the Vacuum Module
Press the following keys:
1.
|
/
~
for “Yes”
“Manual” setting: not possible.
“Automatic”
setting:
Suction turbine starts automatically after
d
is pressed.
Ending Commissioning
Press the following keys:
1.
|
/
~
for “Yes/No”
If “Yes” is selected: The commissioning sequence
is concluded. The display changes to the standard
menu.
If “No” is selected: Commissioning restarts
2.
d
to confirm.
Displaying the Menu Structure
If you exit the commissioning sequence by pressing
“
å
”, the structure of the commissioning menu is
displayed. From here, you can switch to the standard
menu by pressing
ä
.
Setting the Fuel Supply Times
(with vacuum system)
You can individually select specific times during which
you do not want fuel to be supplied.
Refer to the Vitoligno 300-C Operating instructions.
Matching the Control Unit to the Heating System
The control unit must be matched to the system equipment
level. Various system components are recognized
automatically by the control unit and the relevant codes are
set automatically.
Check and adjust all addresses in Coding 1 (see chapter
“Coding 1”).
Note:
Further setting options are listed in Coding 2.