4
Disposal of packaging ............................................................................
Maintenance and cleaning .....................................................................
Fitting the thermal insulation .................................................................. 12
Fitting the retaining rails ..................................................................... 12
Inserting the lower thermal insulation mat .......................................... 14
Aligning the retaining rails and fitting the front panel .......................... 15
Fitting the display panel and sensors ................................................. 15
Routing cables from all components to the control unit ...................... 17
Electric ignition system (if available) ................................................... 17
Fitting the side panels and back panel ............................................... 19
Overview of electrical connections ..................................................... 20
Inserting cables and applying strain relief .......................................... 20
Other electrical connections ............................................................... 20
Fitting the covers ................................................................................... 21
Connections on the flue gas side ........................................................... 22
Connections on the water side .............................................................. 22
Steps - commissioning, inspection and maintenance ............................ 24
Calling up the service menu ............................................................... 58
Leaving the service menu ................................................................... 58
Calling up operating conditions and sensors ......................................... 58
Checking and acknowledging faults ................................................... 61
Calling up acknowledged fault messages .......................................... 61
Calling up fault codes from the fault memory (fault history) ............... 61
Deleting the fault codes from the fault memory .................................. 62
Triggering the function ........................................................................ 65
Cancelling the function ....................................................................... 65
Checking the sensors ......................................................................... 66
Checking the Lambda probe .............................................................. 67
Index
Index
5777 985 GB
Содержание VITOLIGNO 200-S
Страница 72: ...72 Maintenance Extension kit for heating circuit with mixer cont 5777 985 GB Maintenance ...
Страница 78: ...78 Parts lists Control unit assembly cont 5777 985 GB Components ...
Страница 106: ...106 5777 985 GB ...
Страница 107: ...107 5777 985 GB ...