27
After switching the power on, a commissioning
sequence commences. If it does not start automati-
cally, press
Ù
and
Ú
simultaneously and hold for
approx. 5 seconds.
While making the following inputs, these keys may
also be pressed:
ä
to go back one step
å
to display the commissioning menu structure
Selecting the language
Shortly after switching the power on, the display shows
"Select language"
.
Press the following keys:
1.
|
/
~
for the required language.
2.
d
to confirm.
The display shows
"Date setting"
.
Setting the date
Press the following keys:
1.
|
/
~
for the required date.
2.
d
to confirm.
The display shows
"Time setting"
.
Setting the time
Press the following keys:
1.
|
/
~
for the required time.
2.
d
to confirm.
Selecting the number of buffer temperature sensors
Press the following keys:
1.
|
/
~
for buffer temperature sensor
"3"
,
"4"
or
"5"
2.
d
to confirm.
Selecting the type of heating water buffer cylinder
If the test point for capturing the system temperature is
to be selected, press the following keys:
1.
|
/
~
for buffer type.
2.
d
to confirm.
Commissioning, inspection, maintenance
Switching on the power and starting the commissioning sequence
5777 985 GB
Содержание VITOLIGNO 200-S
Страница 72: ...72 Maintenance Extension kit for heating circuit with mixer cont 5777 985 GB Maintenance ...
Страница 78: ...78 Parts lists Control unit assembly cont 5777 985 GB Components ...
Страница 106: ...106 5777 985 GB ...
Страница 107: ...107 5777 985 GB ...