9
Handling and siting
Observe the shipping information on the packag-
ing.
!
Please note
Severe jolts can damage the combustion cham-
ber and the hopper components.
Do not subject the boiler to any severe jolts dur-
ing handling and positioning.
Transport:
■
Transport the boiler to the installation location in an
upright position and, if possible, on the pallet.
■
The boiler can be secured for transportation:
–
With an eye bolt screwed into the centre bracket
on the boiler.
–
With a transport belt fitted around the boiler
between the hopper door and ignition door.
■
Remove the lower door (inspection door or ash door)
from the boiler for transportation with a pallet truck.
Aligning the boiler
!
Please note
Do not damage or lose the foot caps on the
adjustable feet.
Pay attention to the foot caps when lifting the
boiler and removing the pallet.
10
20
Fig. 2
Align the boiler on the adjustable feet with an inclina-
tion towards the front. This allows air bubbles trapped
in the boiler water to escape.
Checking the position of the doors
Note
To ensure the doors are leakproof and the door han-
dles operate easily, the position of the doors must be
checked before installation work begins.
Preparing for installation
Preparing for installation
(cont.)
5777 985 GB
Installation
Содержание VITOLIGNO 200-S
Страница 72: ...72 Maintenance Extension kit for heating circuit with mixer cont 5777 985 GB Maintenance ...
Страница 78: ...78 Parts lists Control unit assembly cont 5777 985 GB Components ...
Страница 106: ...106 5777 985 GB ...
Страница 107: ...107 5777 985 GB ...