7
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Preparing for commissioning and filling the heating
system
.............................................................................
8
•
•
•
2. Checking the gas type
....................................................
9
•
•
•
3. Changing the gas type (if required)
.............................. 10
•
•
•
4. Checking the static and supply pressure
..................... 10
•
•
•
5. Checking the nozzle pressure
....................................... 13
•
•
•
6. Determining the flue gas values
.................................... 16
•
•
•
7. Checking the ionisation current
.................................... 17
•
•
•
8. Checking the draught
..................................................... 18
•
•
9. Removing the burner
...................................................... 19
•
•
10. Checking the burner tubes
............................................ 19
•
•
11. Checking the pilot burner
.............................................. 20
•
12. Cleaning the heating surfaces (if required)
.................. 21
•
•
13. Fitting the burner
............................................................ 22
•
•
•
14. Checking connections on the water side for tightness
•
•
•
15. Checking the safety equipment
•
•
•
16. Checking firm seating of electrical connections
•
•
•
17. Checking all gas equipment for tightness at operating
pressure
........................................................................... 22
•
•
•
18. Checking the external LPG safety valve (if installed)
•
•
•
19. Commissioning the system
•
•
•
20. Checking the closing function of the valves in the gas
train
•
•
•
21. Checking the flue gas monitoring device
..................... 23
•
22. Instructing the system user
........................................... 24
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5692 704 GB