23
Checking the flue gas monitoring device
100
28
A
1.
Switch ON/OFF switch OFF.
2.
Pull the flue pipe from the draught
hood.
3.
To carry out the function test, cover
the flue outlet at the draught hood
with a suitable object.
4.
Start the boiler.
5.
The flue gas monitoring device must
shut down the burner within 2 min.
The burner will then be locked out for
approx. 17 min.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5692 704 GB