Venting the boiler
1.
Close the shut-off valves on the
heating water side.
2.
Connect the drain hose between
top valve
B
and a drain outlet.
3.
Open valves
A
and
B
, and vent
at mains pressure until no sound of
escaping air can be heard.
4.
Close valves
A
and
B
and open
the primary shut-off valves.
Venting the heating system
1.
Close the gas shut-off valve and
switch ON the control unit.
Further details regarding the individual steps
(cont.)
8
Initial start-up, inspection, maintenance
5692
569
GB
Содержание Vitodens 300
Страница 107: ...A1 Main PCB A2 Power supply unit Connection and wiring diagrams external connections 107 Designs 5692 569 GB...
Страница 111: ...Parts lists cont 111 Parts lists 5692 569 GB...
Страница 112: ...Parts lists cont 112 Parts lists 5692 569 GB...
Страница 113: ...Parts lists cont 113 Parts lists 5692 569 GB...
Страница 114: ...Parts lists cont 114 Parts lists 5692 569 GB...
Страница 115: ...Parts lists cont 115 Parts lists 5692 569 GB...
Страница 127: ...127 5692 569 GB...