a)
Gain access to the relevant components by following steps (b) and (c) in
section 9.1.
b)
Pull the electrical cable connector from the pressure switch (B).
c)
Disconnect the plastic sensing pipes from the pressure switch
d)
Release the two screws securing the pressure switch to the gas/air supply
duct and remove the pressure switch.
e)
Replace the pressure switch in reverse order ensuring that the pipes are not
interchanged.
f)
Finally, ensure that the outer casing is secured in position and carry out a
combustion check as in 5.6.
a)
Gain access to the relevant components by following steps (b) and (c) in
section 9.1
b)
Pull off the electrical mains leads and HT leads from the spark generator.
c)
Release the two 4mm socket head screws securing the spark generator to the
burner door casting and remove the spark generator.
d)
Finally, ensure that the outer casing is secured in position and carry out an
ignition check.
9.7 Air Pressure Switch
9.8 Spark Generator
9 Replacement of Parts
a)
Gain access by following step 9.1(b).
9.9 P.C.B
57
Содержание VITODENS 200 WB2A
Страница 8: ...2 6 Hydraulic Circuit Figure 2 B Hydraulic Circuit 2 Technical Specifications 8 ...
Страница 23: ...Figure 4 B Full Wall template 4 Installation Procedure 23 ...
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......