4 Installation Procedure
a)
Route the condensate drain via a tundish or other suitable vented pipework to a
suitable drain.
b)
Ensure that the drainage pipework has a minimum fall of 1 in 20 away from the boiler.
c)
All pipework must be of plastic and must not be reduced in diameter throughout its
length.
d)
Ensure that the siphon is full of water before firing the boiler.
4.11 Condensate Drain Connection
35
Terminating into an internal waste system
A
O22mm plastic condensate pipe
B
External length of pipe 3m max.
C
Open end direct into gully, below
ground but above water level
Terminating into an external waste system
A
O22mm plastic condensate pipe
B
External length of pipe 3m max.
C
Open end direct into gully, below
ground but above water level
Terminating into an external purpose
made soakaway
A
O22mm plastic condensate pipe
B
External length of pipe 3m max.
C
Open end direct into gully, below
ground but above water level
Terminating into an internal waste system
A
O22mm plastic condensate pipe
B
Internal soil and vent stack
Condensation
drain at boiler back
Содержание VITODENS 200 WB2A
Страница 8: ...2 6 Hydraulic Circuit Figure 2 B Hydraulic Circuit 2 Technical Specifications 8 ...
Страница 23: ...Figure 4 B Full Wall template 4 Installation Procedure 23 ...
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......