18
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
................................................................................................. 19
•
2. Adjusting the pre-charge pressure of the diaphragm expansion vessel on the DHW
•
3. Filling the loading cylinder on the DHW side
.................................................................. 21
•
•
•
4. Venting the boiler by flushing
........................................................................................... 21
•
•
•
•
•
•
6. Checking the static pressure and supply pressure
........................................................ 23
•
7. Reducing the maximum heating output
........................................................................... 24
•
8. Matching the circulation pump rate to the heating system
............................................ 25
•
9. Matching the burner output to the flue system
............................................................... 26
•
10. Burner adjustment when connecting multiple flues to a shared flue system
•
11. Checking the combustion quality
..................................................................................... 30
•
•
•
•
13. Checking the burner gasket and burner gauze assembly
.............................................. 33
•
•
14. Checking and adjusting the electrode
............................................................................. 33
•
•
15. Cleaning the heat exchanger
............................................................................................ 34
•
•
16. Checking the condensate drain and cleaning the trap
................................................... 35
•
•
•
•
•
18. Checking the diaphragm expansion vessels and system pressure
.............................. 36
•
•
19. Checking the safety valve function
•
•
•
20. Checking all connections on the heating water and DHW sides for leaks
•
•
•
21. Checking the flue system for unrestricted flow and tightness
•
•
•
22. Checking the firm seating of electrical connections
•
•
•
23. Checking all gas equipment for tightness at operating pressure
................................ 37
•
•
•
25. Setting display backlighting for standby
......................................................................... 37
•
26. Adjusting the display contrast
.......................................................................................... 38
•
27. Setting the signal tone for display operation
.................................................................. 38
•
28. Instructing the system user
.............................................................................................. 38
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5697789
Содержание Vitodens 111-W
Страница 5: ...5 13 Keyword index 58 Index Index cont 5697789...
Страница 59: ...59 5697789...