47
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
•
•
•
•
3. Checking the refrigerant circuit for leaks
........................................................................ 48
•
4. Filling and venting the primary side
................................................................................. 49
•
5. Filling and venting the secondary side
............................................................................ 50
•
•
•
6. Checking the expansion vessel and heating circuit pressure
....................................... 50
•
•
7. Checking the electrical connections for firm seating
..................................................... 51
•
•
•
8. Switching on the main MCB/fuse
•
............................................................................................... 51
•
•
•
10. Checking the system function
.......................................................................................... 62
•
•
•
•
•
•
12. Checking the heat pump for noise
................................................................................... 63
•
13. Instructing the system user
.............................................................................................. 63
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
6153640
Содержание VITOCAL 300-G
Страница 12: ...12 Removing the front panel 3 2 1 4 Fig 3 Installation sequence Siting the heat pump 6153640 Installation...
Страница 14: ...14 5 4 6 Fig 5 7 Fig 6 Installation sequence Siting the heat pump cont 6153640 Installation...
Страница 20: ...20 Opening the wiring chamber 1 2 Fig 10 Installation sequence Electrical connection cont 6153640 Installation...
Страница 22: ...22 6x X X 7 4 8 5 6 Fig 13 10 9 11 Fig 14 Installation sequence Electrical connection cont 6153640 Installation...