39
Phase
Duration
08
VPS decision: Valve leak test
0.1 s
09
VPS: Empty intermediate valve space
1 to 3 s
10
VPS test time: Valve 1
1 to 240 s
11
VPS: Fill intermediate valve space
1 to 3 s
12
VPS detection: Gas pressure
0.1 s
13
VPS test time: Valve 2
1 to 240 s
14
Pre-purge time
0 to 1 h
16
Ignition setting
max. 2 min
17
Gas detection: Min. gas pressure switch
0 ...
18
Pre-ignition time
0 to 1 min
19
Ignition safety time (SZA)
0.5 to 9.4 s
20
SZA flame detection
0.5 s
21
Flame stabilising time
1 to 200 s
23
Transition to control mode
max. 2 min
24
Control mode
0 ...
25
Transition after controlled shutdown
1 to 30 s
32
Burner run-on time
1 to 60 s
33
Post-purge time
0 to 1 h
34
Restart blocking time
0 to 1 h
01
Waiting for heat demand
0 ...
In the case of fault shutdown:
35
Gas shortage: Min. gas pressure switch
0 ...
36
On hold program
0 ...
Burner control unit flow chart
Burner control unit flow chart
(cont.)
5783 337 GB
Diagnosis
Содержание CT3U
Страница 40: ...40 Burner control unit flow chart Burner control unit flow chart cont 5783 337 GB Diagnosis ...
Страница 61: ...61 5783 337 GB ...
Страница 62: ...62 5783 337 GB ...
Страница 63: ...63 5783 337 GB ...