99
Coding in the delivered condition
Possible change
35:0
Without extension EA1
35:1
With extension EA1 (auto-
matic recognition)
36:0
Function output
aBJ
at
extension EA1:
Fault message
36:1
Feed pump
36:2
DHW circulation pump
3A:0
Function input DE1 at ex-
tension EA1:
No function
3A:1
Operating program
changeover
3A:2
External demand with set
flow temperature.
Set value setting: Coding
address "9b" in this group.
Internal circulation pump
function: Coding address
"3F" in this group.
3A:3
External blocking.
Internal circulation pump
function: Coding address
"3E" in this group.
3A:4
External blocking with fault
message input.
Internal circulation pump
function: Coding address
"3E" in this group.
3A:5
Fault message input
3A:6
Brief operation, DHW cir-
culation pump (pushbutton
function).
DHW circulation pump run-
time adjustment: Coding
address "3d" in this group
3b:0
Function input DE2 at ex-
tension EA1:
No function
3b:1
Operating program
changeover
3b:2
External demand with set
flow temperature.
Set value setting: Coding
address "9b" in this group.
Internal circulation pump
function: Coding address
"3F" in this group.
3b:3
Function input DE2: Exter-
nal blocking.
Code 2
"General"
(cont.)
5773 238 GB
Service
Содержание B2UA
Страница 10: ...10 13 14 15 Preparing for installation Preparing the installation cont 5773 238 GB ...
Страница 11: ...11 16 Preparing for installation Preparing the installation cont 5773 238 GB Installation ...
Страница 12: ...12 sF 17 19 21 20 18 Preparing for installation Preparing the installation cont 5773 238 GB ...
Страница 13: ...13 24 22 23 Preparing for installation Preparing the installation cont 5773 238 GB Installation ...
Страница 14: ...14 27 26 25 Preparing for installation Preparing the installation cont 5773 238 GB ...
Страница 15: ...15 28 2x 2x 29 30 Preparing for installation Preparing the installation cont 5773 238 GB Installation ...
Страница 21: ...21 Removing the front panels 2 4 2x 1 3 5 Installation sequence Installing the boiler 5773 238 GB Installation ...
Страница 22: ...22 Siting and levelling the boiler 1 2 SW17 Installation sequence Installing the boiler cont 5773 238 GB ...
Страница 29: ...29 2x 4x 4 3 5 2 1 Installation sequence Opening the control unit casing 5773 238 GB Installation ...
Страница 39: ...39 5 4 2 6 2x 3 1 Installation sequence Closing the control unit casing 5773 238 GB Installation ...
Страница 41: ...41 2x 1 4 2 3 5 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Страница 185: ...185 0010 0004 0001 0003 0004 0005 0009 0006 0007 0008 0007 0002 Parts lists Cylinder module cont 5773 238 GB Service ...
Страница 199: ...199 5773 238 GB ...