35
Plug
lH
Extension EA1
A
lH
N
?
1 L
A
Floating contact (when connecting,
remove jumper across L and 1)
B
[{S
DE
[{D
DE
[{A
DE
A
A
Floating contact
B
Extension EA1
Codes
■ "4b:2" in group
"General"
/
1
■ Effect of the function on the heating cir-
cuit pump:
Coding address "d6" in group
"Heating
circuit"
(only with weather-compensa-
ted control units).
■ Effect of the function on the circulation
pump for cylinder heating (if installed):
Coding address "5E" in group
"DHW"/
3
.
Codes
■ Set "3A" (DE1), "3b" (DE2) or "3C"
(DE3) in group
"General"
/
1
to 3 or 4.
■ Effect of the function on the heating cir-
cuit pump:
Coding address "d6" in group
"Heating
circuit"
(only with weather-compensa-
ted control units).
■ Effect of the function on the circulation
pump for cylinder heating (if installed):
Coding address "5E" in group
"DHW"/
3
.
Power supply for accessories at plug
lH
(230 V~)
Where the boiler is installed in a wet
area, the power supply connection for
accessories must not be made at the
control unit. If the boiler is installed out-
side wet areas, then the power supply
connection for accessories can be made
directly at the control unit. This connec-
tion is switched directly with the ON/OFF
switch of the control unit.
If the total system current exceeds 6 A,
connect one or more extensions via an
ON/OFF switch directly to the mains sup-
ply (see next chapter).
Installation sequence
Electrical connections
(cont.)
5773 238 GB
Installation
Содержание B2UA
Страница 10: ...10 13 14 15 Preparing for installation Preparing the installation cont 5773 238 GB ...
Страница 11: ...11 16 Preparing for installation Preparing the installation cont 5773 238 GB Installation ...
Страница 12: ...12 sF 17 19 21 20 18 Preparing for installation Preparing the installation cont 5773 238 GB ...
Страница 13: ...13 24 22 23 Preparing for installation Preparing the installation cont 5773 238 GB Installation ...
Страница 14: ...14 27 26 25 Preparing for installation Preparing the installation cont 5773 238 GB ...
Страница 15: ...15 28 2x 2x 29 30 Preparing for installation Preparing the installation cont 5773 238 GB Installation ...
Страница 21: ...21 Removing the front panels 2 4 2x 1 3 5 Installation sequence Installing the boiler 5773 238 GB Installation ...
Страница 22: ...22 Siting and levelling the boiler 1 2 SW17 Installation sequence Installing the boiler cont 5773 238 GB ...
Страница 29: ...29 2x 4x 4 3 5 2 1 Installation sequence Opening the control unit casing 5773 238 GB Installation ...
Страница 39: ...39 5 4 2 6 2x 3 1 Installation sequence Closing the control unit casing 5773 238 GB Installation ...
Страница 41: ...41 2x 1 4 2 3 5 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Страница 185: ...185 0010 0004 0001 0003 0004 0005 0009 0006 0007 0008 0007 0002 Parts lists Cylinder module cont 5773 238 GB Service ...
Страница 199: ...199 5773 238 GB ...