The primary store is heated up to the set
DHW temperature. Heating stops when
the specified temperature has been
reached at the cylinder temperature sen-
sor.
After heating has ended, the cylinder pri-
mary pump and the 3-way diverter valve
remain on for a further 30 s.
Reheating when DHW is drawn off
When DHW is drawn off, cold water
enters at the bottom of the primary
store.
The heating circuit pump is switched ON
and the 3-way diverter valve is changed
over, if the cylinder temperature sensor
recognises a temperature lower than the
set value.
■ The cylinder primary pump is switched
ON if the boiler water temperature ≥
set DHW temperature.
■ The burner is switched ON if the boiler
water temperature ≤ set DHW temper-
ature, and the cylinder primary pump
is switched ON when the required
boiler water temperature is reached.
DHW is regulated to the set temperature
via the outlet temperature sensor.
The primary store continues to be heated
up after the draw off process has termi-
nated, until the set DHW temperature
has been reached at the cylinder tem-
perature sensor.
The cylinder primary pump and the 3-
way diverter valve remain on for a further
30 s.
DHW heating via solar collectors
If a temperature differential is measured
between the collector temperature sen-
sor and the cylinder temperature sensor
of the solar control module, which is
greater than the start temperature differ-
ential set in the control unit, the solar cir-
cuit pump is started and the DHW cylin-
der is heated.
The pump is stopped if the temperature
falls below the stop temperature differ-
ential between the collector temperature
sensor and the cylinder temperature
sensor of the solar control module.
The solar circuit pump is stopped if the
set maximum temperature or the tem-
perature set at the temperature limiter is
reached.
Function description
Control unit
(cont.)
5773 238 GB
Содержание B2UA
Страница 10: ...10 13 14 15 Preparing for installation Preparing the installation cont 5773 238 GB ...
Страница 11: ...11 16 Preparing for installation Preparing the installation cont 5773 238 GB Installation ...
Страница 12: ...12 sF 17 19 21 20 18 Preparing for installation Preparing the installation cont 5773 238 GB ...
Страница 13: ...13 24 22 23 Preparing for installation Preparing the installation cont 5773 238 GB Installation ...
Страница 14: ...14 27 26 25 Preparing for installation Preparing the installation cont 5773 238 GB ...
Страница 15: ...15 28 2x 2x 29 30 Preparing for installation Preparing the installation cont 5773 238 GB Installation ...
Страница 21: ...21 Removing the front panels 2 4 2x 1 3 5 Installation sequence Installing the boiler 5773 238 GB Installation ...
Страница 22: ...22 Siting and levelling the boiler 1 2 SW17 Installation sequence Installing the boiler cont 5773 238 GB ...
Страница 29: ...29 2x 4x 4 3 5 2 1 Installation sequence Opening the control unit casing 5773 238 GB Installation ...
Страница 39: ...39 5 4 2 6 2x 3 1 Installation sequence Closing the control unit casing 5773 238 GB Installation ...
Страница 41: ...41 2x 1 4 2 3 5 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Страница 185: ...185 0010 0004 0001 0003 0004 0005 0009 0006 0007 0008 0007 0002 Parts lists Cylinder module cont 5773 238 GB Service ...
Страница 199: ...199 5773 238 GB ...