56
6167 818 - 10
Vitodens 100-W, B1HE/B1KE Combi Installation/Service
Service
Installing the Burner
B1HE/KE 85 and 120
B1HE/KE 150 and 199
1. If necessary, move the programming unit.
2. Insert the burner. Tighten screws
F
diagonally.
Torque: 35 lb.in (4 Nm).
3. Fit gas supply pipe
E
with a new gasket.
Torque: 22 lb.ft (30 Nm).
4. Check the gas connections for leaks.
5. Connect the cables/leads:
Fan motor
A
(2 plugs)
Ionization electrode
B
Ignition unit
C
Ground
D
WARNING
Escaping gas leads to a risk of explosion.
Check all fittings and the gas shut-off valve for
gas leaks.
WARNING
Do not damage the gas pipe!
The gas pipe must not come into contact with any
other components in the appliance.
Keep the gas pipe from twisting during tightening by
using the two wrench system. Do not use pliers!
Содержание B1HE Series
Страница 97: ...97 6167 818 10Vitodens 100 W B1HE B1KE Combi Installation Service B1HE Models 85 120 150 199 Wiring Diagram ...
Страница 98: ...98 6167 818 10 Vitodens 100 W B1HE B1KE Combi Installation Service B1KE Models 120 199 Wiring Diagram ...
Страница 126: ...126 6167 818 10 Vitodens 100 W B1HE B1KE Combi Installation Service ...
Страница 127: ...127 6167 818 10Vitodens 100 W B1HE B1KE Combi Installation Service ...