3
6167 818 - 10
Vitodens 100-W, B1HE/B1KE Combi Installation/Service
Table of Contents
Safety, Installation and Warranty Requirements
..............2
Important Regulatory and Installation Requirements
....... 5
About these Installation Instructions
.............................6
Applicability
..............................................................7
Mechanical Room
......................................................8
Product Information
....................................................9
System Examples
....................................................10
Fitting and Sealing Points
.........................................10
Minimum Clearances
.................................................10
Boiler Dimensions
.....................................................11
Mounting the Boiler and Making Connections
...............13
Piping Connections
..................................................18
Neutralization Unit
....................................................21
DHW Tank Connection
..............................................22
Safety Valve
............................................................23
Flue Gas Connection
.................................................24
Electrical Connections
...............................................25
WiFi Operational Reliability and System Requirements
...29
Closing the Junction Box
...........................................30
Fitting the Programming Unit and Front Panel
...............31
Adjusting pump Rate of Integral Pump
........................32
System Layout 1
......................................................33
System Layout 2
......................................................34
System Layout 3
......................................................35
System Layout 4
......................................................36
System Layout 5
......................................................37
System Layout 6
......................................................38
Boiler with Low Water Cut-off
(remote mounted, field supplied) ................................39
Commission the System with the Commissioning
Assistant
.................................................................40
Filling the Heating System
.........................................42
Checking All Connections on the Heating Water and
DHW Sides for Leaks
................................................44
Checking the Gas Type
.............................................44
Converting the Gas Type for Operation with LPG
..........45
Removing the Front Panel
..........................................45
Removing the Programming Unit to the Maintenance
Position
...................................................................46
Checking the Static Pressure and Supply Pressure
........47
Function Sequenceand Possible Faults
........................48
Seal Test on Coaxial Flue System
(annular gap check) ....49
Safety
General Information
Dimensions
Installation
Commissioning
Page
Содержание B1HE Series
Страница 97: ...97 6167 818 10Vitodens 100 W B1HE B1KE Combi Installation Service B1HE Models 85 120 150 199 Wiring Diagram ...
Страница 98: ...98 6167 818 10 Vitodens 100 W B1HE B1KE Combi Installation Service B1KE Models 120 199 Wiring Diagram ...
Страница 126: ...126 6167 818 10 Vitodens 100 W B1HE B1KE Combi Installation Service ...
Страница 127: ...127 6167 818 10Vitodens 100 W B1HE B1KE Combi Installation Service ...