87
Settings and test values
Set value
Commission-
ing
Maintenance/
service
Maintenance/
service
■
At lower heating output
% by
vol.
See "Check-
ing the com-
bustion qual-
ity" (Com-
mission-
ing ...)
■
At upper heating output
% by
vol.
Oxygen content O
2
■
At lower heating output
% by
vol.
■
At upper heating output
% by
vol.
Carbon monoxide content
CO
■
At lower heating output
ppm
< 1000
■
At upper heating output
ppm
< 1000
Commissioning/service reports
(cont.)
6173886
Appendix
Содержание B0KA
Страница 14: ...14 1 4 5 3 2 Fig 4 Installation sequence Removing the boiler from the packaging 6173886 Installation ...
Страница 28: ...28 1 2 Fig 20 Installation sequence Fitting the front panel 6173886 Installation ...
Страница 78: ...78 1 2 3 6 4 5 7 Fig 42 Troubleshooting Repairs cont 6173886 Diagnosis ...