77
7.
Install plate heat exchanger in reverse order using
new gaskets.
Tighten screws as tightly as necessary and ensure
that the components are undamaged and are func-
tioning correctly throughout service life.
Observe torque settings if a torque wrench is avail-
able.
Screw torque: 3.2 Nm
±
0.2
Note
During installation, ensure the connections are
positioned and the gaskets seated correctly.
Danger
Risk of electric shock from escaping heating
water or DHW
Check all water side connections for tight-
ness.
Removing the hydraulic unit
If components of the hydraulic unit have to be
replaced.
Danger
Risk of electric shock from escaping heating
water or DHW
After installation, check all connections on the
water side for leaks.
Troubleshooting
Repairs
(cont.)
6173886
Diagnosis
Содержание B0KA
Страница 14: ...14 1 4 5 3 2 Fig 4 Installation sequence Removing the boiler from the packaging 6173886 Installation ...
Страница 28: ...28 1 2 Fig 20 Installation sequence Fitting the front panel 6173886 Installation ...
Страница 78: ...78 1 2 3 6 4 5 7 Fig 42 Troubleshooting Repairs cont 6173886 Diagnosis ...