30
!
Please note
Only commission the appliance with a fully filled
trap.
Check that the trap has been filled with water.
Commissioning via commissioning assistant
1.
Open the gas shut-off valve.
2.
If the appliance has not been switched on yet: Turn
on the ON/OFF switch.
Calling up the commissioning assistant:
1.
and
OK
should be pressed simultaneously
for approx. 4 s.
2. Use
/
to select
"b.5"
and confirm with
"OK"
.
Note
AP and
appear on the display. Confirm with
OK to start the connection with the software tool:
See chapter
"Commissioning via software tool".
3.
should be pressed for 4 s to start the com-
missioning assistant via the heat generator dis-
play.
3.
For further steps, see commissioning assistant in
the following overview.
Commissioning via software tool
Note
Apps for commissioning and service are available for
iOS and Android devices.
1.
Open the gas shut-off valve.
2. AP
and
appear on the display.
Press
OK
to carry out commissioning with the soft-
ware tool.
3.
Select
ON
and confirm with
OK
.
4.
Follow the instructions in the software tool.
Commissioning, inspection, maintenance
Commissioning the system
6173886
Содержание B0KA
Страница 14: ...14 1 4 5 3 2 Fig 4 Installation sequence Removing the boiler from the packaging 6173886 Installation ...
Страница 28: ...28 1 2 Fig 20 Installation sequence Fitting the front panel 6173886 Installation ...
Страница 78: ...78 1 2 3 6 4 5 7 Fig 42 Troubleshooting Repairs cont 6173886 Diagnosis ...