16
3.
2.
1.
37
37
4.
5.
4x
4x
Fig. 6
Note
The diagram shows installation on a pre-plumbing jig
for a gas condensing combi boiler.
The boiler can be installed on the following accesso-
ries:
■
Pre-plumbing jig
■
Mounting frame
■
Plumbing wall mounting frame
1.
Replace gaskets.
Internal gasket diameter:
■
Gas connection Ø 18.5 mm
■
Heating water side connections Ø 17.0 mm
Note
Gasket for gas connection is attached to the gas
shut-off valve.
2.
Suspend the Vitodens from the wall mounting
bracket.
Note
After mounting, ensure correct seating.
Installation sequence
Mounting the boiler and making connections
(cont.)
6173886
Installation
Содержание B0KA
Страница 14: ...14 1 4 5 3 2 Fig 4 Installation sequence Removing the boiler from the packaging 6173886 Installation ...
Страница 28: ...28 1 2 Fig 20 Installation sequence Fitting the front panel 6173886 Installation ...
Страница 78: ...78 1 2 3 6 4 5 7 Fig 42 Troubleshooting Repairs cont 6173886 Diagnosis ...