7. Commissioning the Lynx Distributor
Commissioning sequence:
• Check polarity of all DC cables. Check cross sectional area of all DC cables.
• Check if all cable lugs have been crimped correctly.
• Check if all cable connections are tight (don’t exceed maximum torque).
• Tug slightly on each battery cable to check if the connections are tight and if the cable lugs have been crimped correctly.
• Check if the fuses have been placed and their connections are tight (don’t exceed maximum torque).
• Check if the fuse names of the Lynx Distributor (if applicable) are correctly named